Skip to main content

NYC DOB Local Law 11

NYC DOB Local Law 11 Violations, FISP Filings and Facade Repairs

Got a DOB facade violation, a late filing letter, or an Unsafe report from your inspector? We are a licensed and insured NYC facade contractor who turns Local Law 11 paperwork into a clear repair plan, then handles the permits, protection, and repairs your inspector needs to sign off.

Independent contractor. Not affiliated with the NYC Department of Buildings.

What Did You Receive?

A DOB facade violation with penalties attached

Your QEWI found Unsafe conditions that need repair

A notice about a missed or late FISP filing

Over 6 Stories

Buildings covered by FISP

Every 5 Years

Facade inspection by a QEWI

90 Days

To repair Unsafe conditions

24/7

Emergency response for unsafe facades

What Is NYC DOB Local Law 11 (FISP)?

Local Law 11 is the New York City rule that requires owners of buildings taller than six stories to have their exterior walls and attached elements, such as balconies, parapets, railings, and fire escapes, inspected every five years. The NYC Department of Buildings runs it as the Facade Inspection and Safety Program, or FISP. A Qualified Exterior Wall Inspector, known as a QEWI, examines the facade and files a technical report that rates it Safe, SWARMP, or Unsafe.

Most owners reach out after that report or a DOB notice arrives. Unsafe conditions need public protection right away and repairs within 90 days. SWARMP items must be fixed by the date your inspector sets, and missed filings add penalties every month. We read what you received, explain what DOB expects next, and do the repair work that closes it out.

NYC Local Law 11 Requirements for Building Owners

DOB puts the legal duty on the building owner, not the inspector or the managing agent. These five steps keep a building compliant and out of the penalty system.

01

Hire a QEWI Before Your Filing Window Opens

Only a DOB-approved QEWI can perform the critical examination, which includes at least one close-up scaffold drop on a street-facing wall.

02

File the Technical Report on Time

Your QEWI files the report in DOB NOW Safety within your sub-cycle window, and you sign the owner’s statement on the filing.

03

Protect the Public Right Away

When an Unsafe condition is found, a sidewalk shed, netting, or fencing must go up immediately and stay until DOB accepts an amended report.

04

Repair Unsafe Conditions Within 90 Days

If the work will take longer, your QEWI must request an extension before the deadline passes, or daily-accruing penalties begin.

05

Close Out SWARMP Items by Their Due Date

Conditions marked SWARMP must be fixed by the date your QEWI set, or they return as Unsafe in the next cycle.

Local Law 11 Penalties and FISP Deadlines at a Glance

Facade penalties build month after month, so it helps to know exactly which one applies to your building. The amounts below follow the current DOB fee schedule and can change, so confirm the latest figures with DOB or your QEWI.

Issue What Triggers It Possible Penalty Learn More

Late Initial Filing

Report filed after your sub-cycle window closes

$1,000 per month until an acceptable report is filed

Failure to File

No acceptable report on record for the cycle

$5,000 per year

Uncorrected Unsafe Condition

Repairs not done within 90 days and no active extension

Starts at $1,000 per month, with added charges tied to sidewalk shed length the longer it stays open

Gap Between Extensions

An extension lapses before the next one is filed

Unsafe penalties for every day not covered

SWARMP Left Unrepaired

A SWARMP item not fixed by its date and later filed as Unsafe

$2,000

How to Check Your Building’s Local Law 11 Filing Status

You can see where your building stands in a few minutes, without logging in and without calling DOB.

Search the DOB NOW Public Portal

Go to the DOB NOW public portal, open the public search without signing in, and look up your address to see current facade filings and their status.

Look Up Older Cycles in BIS

Filings from earlier cycles live in the Buildings Information System, along with any open facade violations on the property.

Match Your Block Number to a Sub-Cycle

The last digit of your tax block number decides which filing window applies to your building. DOB’s sub-cycle chart lists the dates.

Our NYC DOB Local Law 11 Compliance Services

Each problem below has its own guide, with the rules, documents, and steps explained in plain English.

Clear open facade violations and fix the conditions behind them.

Get a missed report filed and stop monthly penalties from growing.

Prepare the contract, schedule, and permit details your QEWI needs to request more time.

Emergency protection and repairs for conditions that cannot wait.

Fix maintenance items before they turn Unsafe next cycle.

Secure the work permits and shed or scaffold approvals your repairs require.

Finish the repairs and the paperwork so the shed can finally come down.

Document completed repairs so your QEWI can file the amended report.

Our Local Law 11 Process, From DOB Notice to Sign-Off

Every job follows the same path, so you always know what comes next and who is handling it.

  • Send Us What You Received

    Upload the violation, DOB letter, or QEWI report along with a few photos of the facade.

  • Free Report Review

    We read every listed condition, check the building’s DOB record, and visit the site to confirm the scope.

  • Protection and Permits

    We put up sidewalk sheds or netting where needed and file the DOB work permits the repairs call for.

  • Repairs by Our Crew

    Licensed and insured crews complete the masonry, terra cotta, parapet, or balcony work, with photo records at each stage.

  • Inspector Sign-Off

    Your QEWI reviews the finished work and files the amended report, and we help close out the violation.

Who Handles Local Law 11 Inspections and Facade Repairs

Under FISP, only a QEWI can inspect a facade and sign a technical report. We are not inspectors and we never file reports ourselves. Licensed inspectors handle the critical examination and the filings, and our team handles the repairs and permit work in between, so each side does exactly what DOB allows it to do.

Every project is led by Muhammad Ali, our facade contractor. He reviews the report with you, plans the repair scope with your inspector, and stays your single point of contact until the amended report is filed.

Local Law 11 and FISP Terms in Plain English

FISP reports and DOB notices use terms most owners never see anywhere else. Here is what they mean.

FISP

The Facade Inspection and Safety Program, DOB’s official name for the Local Law 11 inspection and filing rules.

QEWI

A Qualified Exterior Wall Inspector, a licensed architect or engineer approved by DOB to inspect facades and file reports.

Critical Examination

The full facade inspection a QEWI performs each cycle, including a hands-on look from a scaffold drop.

Sub-Cycle

The filing window assigned to a building based on the last digit of its tax block number.

SWARMP

Safe With a Repair and Maintenance Program. The facade is safe today but has items that must be fixed by a set date.

Unsafe

A condition that puts people below at risk and requires immediate public protection and repairs within 90 days.

No Report Filed

The status DOB gives a building when no acceptable report was filed in its window, which starts penalties.

Extension Request

A filing that asks DOB for up to 90 more days to finish Unsafe repairs, renewed until the work is done.

Amended Report

The follow-up report a QEWI files after repairs to show DOB that the Unsafe conditions are corrected.

Partial Shed Removal

A request that lets part of a sidewalk shed come down once repairs in that section are finished.

Local Law 11 Facade Repair Projects Across NYC

Brick, stone, terra cotta, parapets, balconies, and fire escapes, the conditions FISP reports flag most often on NYC buildings.

NYC DOB Local Law 11 Service Areas

We handle Local Law 11 repairs and DOB facade compliance work in four boroughs. Each one will soon have its own page.

NYC DOB Local Law 11 FAQs for Building Owners

It applies if your building is taller than six stories, counting the basement but not the cellar. Shorter buildings fall outside the inspection cycle, but owners must still keep their facades safe under the NYC Building Code.

Every five years. Each cycle is split into sub-cycles, and the last digit of your tax block number decides which filing window applies to your building.

Old facade violations stay open until the conditions are corrected and the right filing is accepted, and they can keep penalties running. We review the violation, repair what it lists, and give your inspector the records needed to close it out. Our FISP Violations and Penalties guide covers the steps.

Safe means no defects need action. SWARMP means the facade is safe now but has items to repair by a set date. Unsafe means a condition is dangerous and needs public protection right away, with repairs due within 90 days.

It depends on the scope in your report and the permits the work needs. Small repairs can move quickly once permits are in place, while full facade work with a sidewalk shed takes longer. If the work will run past the 90-day Unsafe deadline, your QEWI files an extension request, and we provide the schedule and contract details it needs.

Most facade repairs need a DOB work permit, and sidewalk sheds and scaffolds need their own permits. The type depends on the scope of work. We coordinate the filings with your engineer or architect and handle the shed and scaffold approvals. Our DOB Facade Repair Permits guide explains each one.

Yes. Most of our jobs start with a report from the owner’s existing QEWI. We build the repair scope from that report and keep your inspector updated through the work.

Send the violation notice, DOB letter, or full QEWI report, plus a few photos of the facade and the building address. You can upload everything through our contact form.

Cost depends on the conditions listed in your report, the height and size of the facade, the access the work needs such as scaffolding or a sidewalk shed, the materials involved, and the permits the repairs require. After a free report review and a site visit we give you a written estimate, so you know the scope before any work begins.

Yes. We offer 24/7 emergency response for unsafe facade conditions, including protection setup to keep the sidewalk safe. Regular office hours are Monday to Friday, 8 AM to 6 PM.

Yes. We are a licensed and insured contractor, and our crews are covered on every job, including scaffold and sidewalk shed work.

No. We are an independent contractor and are not affiliated with the NYC Department of Buildings. We help owners meet DOB requirements by completing the repair work their filings depend on.