SWARMP Repairs in NYC Finished Before Your Next FISP Inspection

A SWARMP rating means your facade is safe today but has items that must be fixed by the completion date in your report. Miss that date and the same items come back as Unsafe in the next cycle. We are a licensed and insured NYC facade contractor who repairs SWARMP conditions to last and keeps the records your inspector needs next time.

Independent contractor. Not affiliated with the NYC Department of Buildings.

SWARMP repairs illustrationA FISP facade report rated SWARMP stating there are no unsafe conditions, with three items to repair and a completion date at least 12 months after filing, leading to the next FISP inspection where repaired items are logged and open items are filed as Unsafe with a one-time $2,000 penalty.FISP FACADE REPORTExterior Wall RatingSTATUSSWARMPThere are no unsafe conditionsITEMS TO REPAIR1Mortar jointsRepoint2Window sealantReseal3Railing surface rustCoatCOMPLETION DATE12 months or more after filingNEXT CYCLEFISP InspectionRepairedLogged in Historyand RepairsStill OpenFiled as UnsafeOne-time $2,000 penaltyFIX IT ONCE, BEFORE THE DATE

In Short

SWARMP Repairs at a Glance

What a SWARMP Facade Rating Means Under Local Law 11

Under 1 RCNY 103-04, SWARMP describes a wall or attached element that is safe on the day of inspection but needs repair or maintenance within the next five years, and no sooner than one year. The goal is to fix it before it can decline into an unsafe condition.

A SWARMP report states that there are no unsafe conditions, lists each item with photos and a location diagram, and gives a completion date. DOB does not allow that date to fall less than 12 months after the report is filed. If an inspector would write words like immediately or ASAP about an item, it is not SWARMP at all, and the facade has to be rated Unsafe.

The rating and the date come from your licensed inspector. We take the item list from the report and turn it into a repair plan that finishes well before the date.

Reviewed by Muhammad Ali, Facade Contractor

Licensed and insured Local Law 11 repair work across NYC

Definitions from DOB’s Façade & Local Law page and Façade Report Guidelines.

Eroded mortar joints in a brick wall, a typical SWARMP condition

How the SWARMP Completion Date Sets Your Repair Deadline

The clock starts when the report is filed and ends at your next inspection.

Start

Report Filed

Your inspector files the report in DOB NOW Safety with a completion date for the SWARMP items.

Month 12

12-Month Minimum

The completion date cannot be set any earlier than this, so every owner has at least a year to plan the work.

Up to Year 5

Repairs Finished

Repairs should be finished by the completion date, which can sit up to five years out. Keep dated photos and permit numbers from the job.

Next Cycle

Next FISP Inspection

Your inspector rechecks each prior SWARMP item. Finished work is recorded in the report’s History and Repairs section with a certification. Open items must be filed as Unsafe.

A former SWARMP item filed as Unsafe brings a one-time $2,000 failure to correct penalty, immediate public protection, and a 90-day repair window. Our Unsafe facade correction page covers that path, and our FISP violations guide explains the penalty.

SWARMP Conditions We Repair Before They Turn Unsafe

These items are safe today but wear a little more each season. Each card shows the fix that usually closes it out.

Worn Mortar Joints

Joints that have eroded or cracked are raked out and repointed with mortar matched to the brick, so water stops working into the wall.

Failed Sealant Around Windows

Dried, split, or missing sealant at window perimeters and expansion joints is cut out and replaced before leaks reach the steel behind it.

Hairline Cracks and Minor Spalls

Small cracks and shallow spalls in brick, stone, or concrete are routed and patched while they are still cosmetic.

Surface Rust on Railings and Fire Escapes

Light rust on railings, fire escapes, and exposed lintel edges is cleaned to bare metal, primed, and coated before it eats into the section.

Window Air Conditioner Units

Loose brackets, missing supports, and gaps around through-wall and window units are secured and sealed, a condition DOB lets inspectors rate SWARMP.

Roof Flashing and Coping Joints

Lifted flashing and open joints at parapet copings are reset and sealed so water stops entering the top of the wall.

Should SWARMP Repairs Wait Until the Next FISP Cycle?

The report gives you time, but how you use it changes the cost and the outcome.

What changes Repaired early in the window Left open until the next inspection
Size of the repair
Small fix while the item is still minor
Wear keeps growing, often into a larger job
Rating next cycle
Recorded as repaired, with a certification
Must be filed as Unsafe
Penalty
None
One-time $2,000 failure to correct penalty
Public protection
Only while crews work overhead
Required right away once rated Unsafe
Scheduling
You pick the season and bundle items
A 90-day window set by the filing date

Fix It Once, Not Twice

If a SWARMP item is repaired and then needs repair again in the very next cycle, DOB says it must be filed as Unsafe. A quick patch that fails costs more than a lasting repair done right the first time.

SWARMP repairs NYC crew sealing window joints from a hanging scaffold

How We Complete SWARMP Facade Repairs Ahead of the Due Date

One plan covers every item on the report and finishes ahead of the date.

1

Item-by-Item Report Review

We list every SWARMP item with its location, its completion date, and the repair it needs, so nothing is missed.

2

Scope, Season, and Permits

We group items into one setup, file the work permits the job needs, and book masonry for weather that lets mortar cure.

3

Lasting Repairs by Our Crew

Repointing, sealant, patching, and coatings are done to hold through the next cycle, not just to pass it.

4

Records for Your Next Report

Dated before and after photos, a scope letter, and permit numbers go to your inspector for the History and Repairs section and the certification.

SWARMP Items on Your Last Report?

Send us the report, and we will list each item, its due date, and what the repair involves at no cost.

SWARMP Repair Costs and the Factors Behind Them

Pricing follows the item list in your report and how the wall is reached. We quote after reading the report and seeing the facade.

SWARMP Terms You Will See in Your FISP Report

These words appear in your facade report and in DOB NOW Safety.

Completion Date

The date in the report by which SWARMP items should be repaired, set no sooner than 12 months after filing.

History and Repairs

The part of the next report where the inspector records how earlier items were fixed, with work and shed permit numbers.

Prior-Cycle Repair Certification

The statement in the next report confirming that repairs flagged in the last cycle are finished.

Failure to Correct SWARMP Penalty

A one-time $2,000 civil penalty when a SWARMP item from the last cycle is still open and the facade is rated Unsafe.

Common Questions About SWARMP Repairs in NYC

Have SWARMP items on your report? Call (917) 355-8556 or send us the report for a free review.

Until the completion date your inspector set in the report. DOB requires that date to be at least 12 months after filing, and the SWARMP definition allows up to five years. Every item must be done before the next FISP inspection.

Finish the work as soon as you can. DOB can issue violations when repairs are not made on time, and at the next inspection any open item must be filed as Unsafe with a $2,000 penalty.

No. Amended reports are for Unsafe conditions. SWARMP repairs are recorded in your next report, where the inspector certifies that the prior-cycle work is finished. Our amended FISP report guide covers when one is required.

A SWARMP rating alone does not require protection. A shed or other protection goes up when work over the sidewalk begins, as most facade jobs on taller buildings require. Our sidewalk shed removal guide covers taking it down.

Many do. Masonry rebuilding, scaffolds, and sidewalk sheds usually need permits, while small sealant work may not. Our facade repair permits guide explains which filings apply.

Yes. DOB’s report guidelines let inspectors classify air conditioner unit conditions as SWARMP. Loose brackets or missing supports should be fixed before the completion date.

Yes. If the same SWARMP item was repaired and needs repair again in the next cycle, DOB requires it to be filed as Unsafe. That is why we build repairs to last, not just to pass.

Yes. Most SWARMP work happens from outside on rope rigging or a hanging scaffold. We keep noisy work to set hours and give notice before crews reach each window line.