DOB Facade Repair Permits in NYC That Keep Local Law 11 Repairs on Schedule

Before a facade crew can rebuild a parapet or replace a lintel, DOB usually needs a filing, a work permit, and a permit for any shed or scaffold. Some small repairs are exempt, and landmark buildings need a separate approval first. We are a licensed and insured NYC facade contractor who sorts your repair list, lines up the right permits, and starts work the day they are issued.

Independent contractor. Not affiliated with the NYC Department of Buildings.

Facade repair permits illustrationA facade report repair list sorted into permit work, exempt work, and landmark review, leading to a DOB NOW Build alteration filing with work, shed, scaffold, and fence permits, a Table 3 exempt work card, an LPC approval card, and a sign-off with a Letter of Completion.FACADE REPORTRepair Items SortedParapet rebuildPERMITLintel replacementPERMITBrick repointingEXEMPTWindow sealantEXEMPTCornice on a landmarkLPC FIRSTSidewalk shedPERMITEvery item gets a lane before work startsDOB NOW BUILDAlteration FilingWorkShedScaffoldFencepermits issuedTABLE 3Exempt WorkNo work permit, within DOB limitsLANDMARKSLPC Approval FirstThen the DOB filingSIGN-OFFLetter of Completion

In Short

Facade Repair Permits at a Glance

Which DOB Permits a Facade Repair Needs in NYC

Facade work on brick, terra cotta, stone, concrete, lintels, parapets, fire escapes, and railings is generally done under a DOB permit issued to the licensed trade doing it. Most jobs need more than one filing, because the repair and the protection around it are permitted separately.

Reviewed by Muhammad Ali, Facade Contractor

Licensed and insured Local Law 11 repair work across NYC

Supported scaffold on a brick building that needs its own DOB permit during facade repair

Alteration Filing and Work Permit

A registered design professional files the repair plans in DOB NOW Build. Once approved, the work permit is issued to the contractor named on the job.

Sidewalk Shed Permit

Every sidewalk shed needs its own DOB permit, filed in DOB NOW Build before it goes up.

Supported Scaffold Permit

A supported scaffold taller than 40 feet needs a permit, and its height includes any shed it stands on.

Construction Fence Permit

A fence that closes off part of the sidewalk during work is a separate permit with its own sign-off.

Facade Repairs Exempt From a DOB Work Permit

Table 3 of 1 RCNY 101-14 lists facade work DOB exempts in every building, within set limits.

Exempt work Limit set by DOB
Brick or unit masonry repointing
No size limit listed
Replacing individual bricks in the outer wythe
Up to 10 sq ft in any 100 sq ft of wall, no wider than 4 ft, and 150 sq ft total across all facades
Sealant, caulking, and regrouting
No size limit listed
Crack repair by mortar or cement injection
Masonry and concrete, no size limit listed
Parapet replaced at the same height
Up to 10 sq ft in any 100 sq ft of parapet face
Masonry, window, and door sills
Repair or replacement
Fire escape reinforcement
Bars, struts, baskets, and supports
Inspection probes
Under 10 sq ft in any 100 sq ft of wall, 150 sq ft total

What an Exemption Does Not Cover

The repair may skip a work permit, but any sidewalk shed or protection it needs is still filed with DOB, and landmark buildings still need LPC approval. In a true emergency, a licensed contractor can start stabilizing work first and file within two business days.

How a Facade Repair Permit Moves Through DOB NOW Build

Each step has an owner, and a gap at any one of them holds up the crew.

1

Scope and Drawings

The design professional turns the inspector’s findings into repair drawings and details.

2

Filing in DOB NOW Build

The job is filed online, the owner signs, and the plans go to DOB review or are professionally certified by the filer.

3

Permits Issued

The work permit and any shed, scaffold, or fence permits are issued and posted at the site.

4

Work and Inspections

Repairs proceed under the permit, with any special or progress inspections the job requires.

5

Sign-Off and Letter of Completion

Once the job reaches sign-off, inspectors certify their items, the final cost is confirmed, and a Letter of Completion is requested.

Historic masonry facade where repairs need landmark approval before work starts

Landmark Facade Repairs Need LPC Approval Before DOB Permits

If the building is an individual landmark or sits in a historic district, DOB requires prior approval from the Landmarks Preservation Commission for facade work. LPC staff can approve most repairs of deteriorated facade materials without a public hearing.

What LPC Staff Look For

We build those samples and the seasonal schedule into the plan, so landmark review does not stall the repair window.

Fitting Permit Time Inside Your FISP Repair Deadline

DOB deadlines keep running while a permit is in review, so the filing has to start early.

Unsafe Conditions

The 90-day repair window does not pause for permits. If review or landmark approval will push past it, your inspector can request a FISP extension before the window closes.

SWARMP Items

With at least a year to the completion date, there is time to file, get approval, and book the right season. See our SWARMP repairs guide.

Emergency Make-Safe

Removing loose material and putting up protection can start right away, with the filing made within two business days. Permanent repairs follow under a regular permit.

Facade repair permits NYC crew starting masonry work after approval

How We Handle Facade Repair Permits So Work Starts Sooner

We handle the contractor side of every filing and keep the design professional and inspector in step.

1

Sort the Repair List

Each item from the report is marked as permit work, exempt work, or landmark review, so nothing waits on the wrong filing.

2

Scope for the Filing

We give the design professional measured quantities, means and methods, and the protection layout needed for the drawings.

3

Protection Filed With the Job

Shed, scaffold, and fence permits are filed alongside the work permit so the crew can mobilize the day approval lands.

4

Records for Sign-Off

Dated photos, inspection items, and the final cost go into the sign-off package, and copies go to your inspector for the next report.

Not Sure Which Permits Your Repairs Need?

Send us your facade report, and we will sort every item into permit work, exempt work, or landmark review at no cost.

Facade Repair Permit Costs and Review Times in NYC

No two filings move at the same pace. These factors decide most of it.

DOB Permit Terms on a Facade Repair Job

These come up in DOB NOW Build and on the permit itself.

DOB NOW Build

The online system where facade repair jobs, shed, scaffold, and fence permits are filed and tracked.

Registered Design Professional

The licensed architect or engineer who prepares and files the repair drawings.

Professional Certification

A filing where the design professional certifies the plans comply, so the job can move without full DOB plan review.

Letter of Completion

The closing document requested after the job reaches sign-off, confirming the permitted work is complete.

Questions About DOB Facade Repair Permits

Have a repair list and not sure what needs filing? Call (917) 355-8556 or send us the report for a free permit review.

Most structural and larger repairs do, such as rebuilding parapets, replacing lintels, or re-anchoring terra cotta. Smaller items on DOB’s Table 3 list, like repointing and sealant, can be done without a work permit.

No. Brick repointing is on DOB’s exempt facade work list. Any sidewalk shed or scaffold used for the job still needs its own permit, and landmark buildings still need LPC approval.

A registered design professional files the plans in DOB NOW Build and the owner signs the filing. The work permit is then issued to the licensed contractor doing the repairs.

It depends on the scope, whether the plans are professionally certified or reviewed by DOB, and whether landmark review applies. Starting the filing as soon as the report is in protects your FISP deadline.

Yes. A licensed contractor can begin emergency work, such as removing loose material and putting up protection, as long as the filing is made within two business days.

Yes. Every sidewalk shed needs a permit filed in DOB NOW Build, and so does any supported scaffold over 40 feet. Our sidewalk shed removal guide covers taking it down.

Yes. DOB requires Landmarks Preservation Commission approval before facade work on a designated building. LPC staff approve most repairs, with rules on matching mortar, samples, and weather.

DOB can issue violations and stop the work until the right permits are in place. Our FISP violations guide explains how those are cleared.